Scheduling with Proportional Linear Deteriorating and a Maintenance Activity
Abstract
In this paper, we consider single machine scheduling with proportional linear deteriorating in which the processing time of a job depends on its starting time in a sequence. We assume that a maintenance activity is performed in a schedule. After a maintenance activity, machine will revert to its initial condition. The objective is to find simultaneously the optimal sequence for jobs and the position of a maintenance activity to minimize the makespan. A polynomial time algorithm is provided to solve the problem.
Keywords
Scheduling, Deteriorating effect, A maintenance activity
DOI
10.12783/dtcse/mso2018/20500
10.12783/dtcse/mso2018/20500
Refbacks
- There are currently no refbacks.